Typical Bathroom Installation Timescale The old bathroom no longer suited the needs of the customer, who wanted a more stylish & functional bathroom. A plan was drawn up to swop round the existing layout to suit the customers requirements. A sunken short bath was to be added under the existing window and a wall hung toilet & basin were to be fitted onto new studwork. Underfloor heating was to be added to the floor and all the walls & floor were to be tiled as well as the bath panel. All the existing suite was removed and the radiator pipework was capped off under the floor. Studwork was build to conceal the wall hung toilet frame (that would support the toilet off the floor) and also to hang the basin off, whilst concealing all pipework. This wooden studwork was extended to provide additional support for the bath and to provide a framework for the tiled bath panel. Hot & cold pipework were run to the basin, toilet, bath taps and shower valve positions. Waste pipes were connected up and tested before being entombed behind plasterboard. Read the full article fromm our #LinkInBio #bathroomdecor #bathroomdesign #bathroomideas #showerinspo #interiordecoration #homedecor #cosy #modernhome #design #bathroomstyle #bathroom #designinspiration #designlife #homedesign #homedesignideas #homedesigners #interiordesign #interiordesigner #interiors #homedecor #roominspiration #luxurybathroom #instadesign #bathroominspo #luxuryshower #saturdaymood #saturdayvibes #squaredshowerwall
Related Posts